RE: SpongeBob's RV Garage
David
Be sure that the contractor have a space between the soil and the steel (at least 1" above the soil, a vapor barrier is also a good idea) I would use 18" spacing between the rebar's and tie the cross rebar's with wire ties.
What a project good luck.
I will text you with my project at the new house later today
.