02-10-2019, 12:23
Post: #5
|
|||
|
|||
RE: SpongeBob's RV Garage
David
Be sure that the contractor have a space between the soil and the steel (at least 1" above the soil, a vapor barrier is also a good idea) I would use 18" spacing between the rebar's and tie the cross rebar's with wire ties. What a project good luck. I will text you with my project at the new house later today . |
|||